stilwell logo

0333 700 4001

stilwell logo
Guildford Controlled Parking Zone (CPZ)Guildford Controlled Parking Zone (CPZ) read more >
Junction Alterations to improve Road SafetyJunction Alterations to improve Road Safety read more >
Meadows Gyratory 'Tracked Roundabout'Meadows Gyratory "Tracked Roundabout" read more >
Action plan following the 2007 FloodsAction plan following the 2007 Floods read more >

Services: For Local Authorities and the Public Sector

See Our Services for a comprehensive list of our capabilities

"The Stilwell Partnership were timely and professional throughout and offered a specialist service which the Borough Council could not provide in house... (Walton-on-Thames High Street Improvement) was quite a complex and high profile scheme which involved a range of specialist designs and contracts. We were very satisfied with their attitude and quality of work and could not have delivered this type of project without their support and expertise. "
Clare Smith, Elmbridge Borough Council

For further information on any of our projects contact us here >


 

 

The project examples below show details of our relevant experience:


Development Control and Management Services


Royal Borough of Windsor and Maidenhead

Royal Borough of Windsor and Maidenhead

Strategic Asset Management Technical Support

Supporting the Development of the Authority’s annual highway maintenance programme.More >

Project Description:

To provide a cost effective technical contribution towards the development and implementation of the Client’s annual capital highway maintenance programmes

Implementin The 'Pitt' Recommendations in Cheltenham - Lessons from the Floods

Borough of CHELTENHAM, GLOUCESTERSHIRE

Action plan following the 2007 Floods

Assessment and action plan for how the 'Pitt' Report should apply to the Borough.More >

Project Description:

The "Pitt" recommendations propose that the Local Authority should:

  • "take a lead on the management of local flood risk"
  • "positively tackle local problems of flooding working with all relevant parties, establishing ownership and legal responsibility"
  • "collate and map the main flood risk management and drainage assets (over and underground), including a record of their ownership and condition"

Drainage assets in the Borough are the responsibility of The Environment Agency, Severn Trent Water, Gloucestershire County Council, and private riparian owners.

In addition, advanced CAD and GIS technology has only been available since the formation of the various agencies responsible for drainage. Therefore, this was probably the first opportunity to review their records in combination and in a convenient overview format.

TSP proposed a number of measures which meet the objectives of the Pitt report covering management, technical issues and development.

Development of London Centre for Cerebral Palsy

Burwood Park, Hersham, Surrey

Estate roads condition report

Detailed assessment and maintenance strategy for the private estate road network.More >

Services Provided:

The supply of a qualified Engineer, experienced in highway maintenance techniques, problem resolution and materials.

Project Description:

The streets within the survey area were all walked and any notable visual maintenance defects or comments were recorded and supported by photographic evidence. The existing structure of the carriageway was established by the analysis of trial holes and a coring programme. A final report made recommendations for possible treatments and likely life expectancy.


Traffic & Parking Management and Road Safety Engineering


Walton on Thames High Street Improvement

Wokingham Borough Council

Stage 2 & 3 Road Safety Audit

Stage 2 & 3 Road Safety Audits for Wokingham Rail station improvement More >

Stage 2 and Stage 3 Road Safety Audits of the traffic management and road improvements associated with the enhancement of Wokingham rail station.

Services Provided:

  • Stage 2 Road Safety Audit
  • Stage 3 Road Safety Audit
Walton on Thames High Street Improvement

Elmbridge Borough Council

Walton on Thames High Street Improvement

Detailed Highway Design and Construction Procurement More >

Services Provided:

  • Major Highway Improvements
  • Highway Drainage, Surface Water & Foul Water Drainage Systems
  • Contract Documentation
  • Public Consultation and Exhibitions
  • Project Management & Supervision
  • Utilities & Services
Drainage consulting and flood risk

Borough Of Guildford, Surrey

Guildford Controlled Parking Zone (CPZ)

Extension of CPZ to areas outside town centre.More >

To control over-spilled parked cars which are displaced from Guildford Town Centre into surrounding residential areas and which cause disruption to residents

Services provided:

  • Traffic Surveys & Analysis
  • Waiting restrictions & Parking Studies
  • Controlled Parking Zones (CPZ)
  • Public Consultations & Exhibitions
  • CAD & Surveying
MEADOWS GYRATORY SYSTEM 'TRACKED ROUNDABOUT', A30 CAMBERLEY, SURREY

Surrey Heath Borough Council, SURREY

Meadows Gyratory "Tracked Roundabout"

Comprehensive traffic & road safety study pioneering the tracked roundabout system.More >

Our analysis of the poor accident record revealed poor lane discipline and driver behaviour as a root cause. The Stilwell Partnership pioneered the use of Track markings. We worked with Wilson and Scott (white lining company) to develop a track marking, to work with the Spiral Marking concept. We also were the first to use plasta-flex.

Services Provided:

  • Urban & Rural Road Safety Management
  • In-depth accident analysis
  • Traffic Surveys & Analysis
  • Junction Design, inc pioneering development of "Tracked Roundabouts"
  • Public Consultations & Exhibitions
  • CAD, Surveying & Modelling packages
Service Station Road Safety Audit

London Borough of Hillingdon

Road Safety Audit for new Service Station

Stages 2 & 3 Road Safety Audits for new Service Station.More >

Project Description:

Analysis of drawings and site visits observed regular usage of road by cyclists, provision of deceleration lane and traffic splitter islands for right turn lane reduced available overtaking width for vehicles passing cyclists, recommendation and agreement to provide a shared cycleway/footway before and after the service station and other safety-related issues at both Stage 2 and Stage 3.

Development of London Centre for Cerebral Palsy

HURSTPIERPOINT & Parish Council, West Sussex

High street improvements - Feasibility Study

Development of highway options to improve road safety and reduce congestion.More >

Services Provided:

  • Road Safety Studies and Management
  • Traffic & Parking design solutions
  • Design of Highway Improvements
  • Public Consultations

Project Description:

TSP was appointed to investigate the pedestrian and traffic movements in the High Street, assess areas of conflict and road safety concerns and prepare a design scheme to address these issues. The scheme was to be incorporated into a Public Consultation requiring the complex background issues and design proposals to be clearly presented.

Aldershot Parking Study

Rushmoor Borough Council

Aldershot Parking Study

TSP were appointed to investigate the parking issues within Aldershot town centre.More >

Services Provided:

  • Traffic surveys and analysis
  • Parking strategies and management
  • Waiting restrictions and Parking studies
  • Controlled Parking Zones (CPZ)
  • CAD & Surveying

Project Description:

The services provided as part of this project included:

  • Survey of existing waiting restrictions and on-site features required to be known in order to design waiting restrictions and signing.
  • Parking volume and duration surveys on a neutral weekday and Saturday to identify demand and problem areas.
  • Identification of problem areas and options for increased uptake of parking and financial vitality.
  • Identification of residential parking problems and options for improvement.
  • Design of revised or new waiting restrictions to reduce inconsiderate parking and unsafe parking, such as on junctions, bends or double yellow lines.
  • Presentation of findings to Client and local Members.

Design of Highway Infrastructure Improvements


West Wales Airport Runways Extension and Widening

Blaenannerch, Ceredigion, West Wales

West Wales Airport Runway Extension

Runway extension and widening improvement to Class 2C standard.More >

Services Provided:

TSP commissioned a geotechnical investigation to establish existing ground conditions. In addition an investigation of the existing surface water drainage and land drainage of the airport was carried out. TSP produced horizontal and vertical alignment of the runway extension and widening to Class 2C of CAP168 technical requirements. We also developed a pavement design with the client to maximise use of available on-site material. During the construction work we attended the site and witness construction progress and quality.

  • Civil Engineering Design of the Runway Extension and Widening to Technical Design Standard CAP168
  • Surface Water Drainage Design with on-site retention capacity
  • CDM2007 Project Coordinator
  • Site Attendance and Inspection during the construction
Pont Briwet Road/Rail Bridge Replacement Scheme

Llandecwyn and Penrhyndeudraeth

Pont Briwet Bridge Replacement Scheme

Detailed Design and Specification of Bridge Approach Highway and Junctions.More >

Project Description:

As a member of the design team, TSP provided all highways and drainage civil engineering design of the approach roads to the bridge including adjacent junction improvements. The civil engineering design included production of Construction Drawings and Specification for Highway Works. The project also presents significant challenges of coordination and therefore utilises Building Information Management (BIM) procedures to ensure an efficient design and construction process

TAG Farnborough

Farnborough, Hampshire

New Access to TAG Airport, Farnborough

Highways and Transportation Analysis for the Planning Application.More >

Project Description:

The Client proposed relocating Farnborough Airport’s main visitor access to a new access road from a reconfigured roundabout. TSP were appointed to provide engineering design support for the Planning Application.

  • Drainage Design
  • Transportation Assessment
  • Design of Highway Improvements
  • CAD
  • Section 278 Agreement

Minor Works Design & Procurement


Waverley Borough Council

Waverley Borough Council

Upfold Close Car Park Improvements

The design and project management of an improvement to the resident’s car parking.More >

Project Description:

To improve the resident’s car parking by designing and project managing the construction of a 12 space car park with all associated drainage, access and lighting.

  • Design of Highway improvements
  • Tendering and Contract Administration
  • Project Management & Supervision
  • Production of Contract Documentation and Construction Specification
Hornchurch, Essex, High Street, Hornchurch

Hornchurch, Essex

High Street, Hornchurch

Detailed Highway Design, S278 Agreement and Site Supervision for new pedestrian access.More >

To provide pedestrian Zebra Crossings, loading bays and improve the streetscape of a section of the High Street associated with a new ASK restaurant located on a circulatory island.

Services provided:

  • Detailed Highway Design
  • Stage 2 Road Safety Audit
  • Completing the Section 278 Agreement
  • Production of Contract Documentation
  • Management of the Tender Process
  • Traffic Management Plan
  • Organising Utilities Diversions
  • CDM Services
  • Site Supervision