The Feasibility Stage
Our input starts at the very conception of the Housing or Commercial Development. We engineer design solutions to traffic, parking, highways and drainage issues. Subsequently, we produce drawings to required design standards, which may then form the basis of a Section
278 and/or 38 agreement.
assessing the impact of a development on the local transport network.
An early Transport Assessment can avoid expensive and time consuming delays.
Flood Risk Assessments
undertaking assessment of the potential flooding risk and impact of proposed development projects to PPS Development & Flood Risk December 2006.
Road Safety Audits
undertaking Road Safety Audits, Stages 1 through to 4, in accordance with Highway Agency procedure DMRB Vol 5, HD 19/03.
required with most planning applications, our broad experience can
integrate innovative sustainable measures such as the CityCarClub initiative.
|
|
|
The Detailed Design Stage
After the successful award of Planning Permission for the development, we would discharge the planning conditions, producing detailed engineering drawings for the Section
278 and/or 38 agreement.
detailed design drawings and specifications for development infrastructure, including estate roads, surface and foul water drainage and utility services. successfully undertaking Major
Highway Improvements, including rail bridges and culverts.
inc. capacity checks, connection and diversion approvals, soakaway design, attenuation tank calculations and design. developing the optimum
drainage solutions, balancing storage and discharge of surface water within the constraints of the Environment Agency.
|
|
The Procurement Stage Contract documentation for each of the above design projects we would prepare specifications and drawings, a list of suitable contractors and invite tenders. Project
management and supervision following appointment of the successful
contractor we would provide contract administration, inspection
of completed works and project management services. Utilities & Services throughout the procurement process we would coordinate service systems and diversions within the overall construction works.
|
|
|
|
 |
|
|